
The Rebuild
Three new cabins and the Huckstop, new services throughout, a rock-anchored retaining wall and an armoured stream, and one unforgettable day when the cabins arrived by air.
~$2M
Invested in the rebuild
3 + 1
New cabins, plus the Huckstop
44 min
To fly in five modules
8 m
Rock-anchored retaining poles
The investment figure is approximate and owner-stated.
Chapter One · Why we rebuilt
In August 2022, days of extreme rain brought down a slip high in the gully above the western side of the property. The debris blocked the culvert and took out the old boatshed and two of the 1940s sleepouts. The main house and its immediate surroundings were not affected.
Those buildings had stood through nearly eighty years of Sounds weather, and they were tired: single glazed, a little musty, one fit only for garden tools.
Replacing them had long been the plan; the storm simply set the date. Rather than patch, the owners rebuilt everything below the main house from the ground up.
“The storm decided the timetable. How we rebuilt was our choice, and we chose to over-build.”
Chapter Two · The Engineering
Designed and monitored by Leigh McGlynn of Davidson Group, a specialist Marlborough Sounds geotechnical engineer with 35 years' experience out here. Two jobs: retain the one slope that had never been retained, and take the stream out of the equation for good.
The top lawn is special: ideal for sunbaking, kicking a ball or putting up a marquee, and flat lawn is rare in the Sounds. Its seaward edge, though, had never been retained. The owners commissioned the fix in April 2022: a line of timber poles embedded eight metres deep, tied back with 25mm galvanised steel rods anchored into the rock, consented (RC U220950) and proof loaded to confirm the anchors hold. Crafar Crouch did the drilling and concreting.
Max Rudkin spent decades building rock walls to hold this hillside; the new wall finishes what he started, its poles set eight metres deep and tied back into the rock with steel anchors. It is built to hold for generations that have not been born yet.
The new cabins stand on their own driven piles: 4.4m under the bedrooms and 5.4m under the bathrooms and decks, each 200mm in diameter.
The depth of the 325D retaining wall poles, engineered by Leigh McGlynn
Drilling the 12-metre tie-backs
Concreting the new retaining wall
The culvert is gone, replaced by an open spillway with nothing left to block. The stream was cleared and deepened, armoured with around 180 tonnes of rock, and bunded so any future debris is held back from the buildings. The new bridge lets water and debris pass clean beneath it to the beach.
Beneath it all runs an entirely new services layer. Stormwater, drainage, underground power reticulation, new sewers, and a new wastewater treatment system pumping to an irrigation field.
Chapter Three · The Rebuild
With the ground made good, the rebuild began. Sam Edwards and his team at Tory Channel Construction handled the earthworks, barging and the new bridge. Small Spaces of Hamilton designed and built the cabins and the Huckstop, flew down to set the piles, and were on site for the lift.
The 44-minute day
The cabins were trucked to Picton, barged up the Sound, and flown into place by Darren of Southern Heli Lift in his ex-Vietnam Iroquois. In about forty-four minutes he set all five modules, three one-bedroom cabins and two bathroom units, plus the new 30,000-litre water tank and three further lifts of crusher dust. Water access only does not mean compromise. It means a barge, a nearly-70-year-old helicopter, and a crew who know exactly what they are doing.
“A few months of careful planning, made real in moments. The cabins all grounded, safe and home; no hiccups, just gratitude, pride and awe.”
Five cabins. One nearly-70-year-old Iroquois. 44 minutes. Watch the day they flew in (2 min 36).
The Huckstop, with two bathrooms, a small kitchen and laundry, and a deck, was piled, framed and roofed on site by the Small Spaces team, who drove back down from Hamilton to build its structure along with the cabin decks and awnings. Fully waterproofed, connected to the new services, and finished to the same standard as the cabins it serves.
Chapter Four · The Outcome
What was a building site is now, again, one of the loveliest corners of the property. The difference is invisible on a summer afternoon, and that is the point: the work is all underneath.
The measure of the rebuild is not what was fixed but what was raised.
Cabins
Then: three 1940s cabins, single glazed, one fit only for garden tools.
Now: warm, modern and double glazed, designed and built by Small Spaces.
Harper-Lowry family cabin
Then: tired.
Now: refreshed, with new guttering, new double glazed doors, two new decks, and repainted.
Foundations
Then: whatever the 1940s left behind.
Now: solid engineered piles, driven metres down and set in concrete.
Stormwater systems
Then: soaked away to ground.
Now: new stormwater systems throughout. Gutters and downpipes capture the water, and it is piped, controlled, and discharged to the stream.
Wastewater
Then: a septic system 60 to 70 years old.
Now: a new wastewater system with irrigation field.
Power & wiring
Then: overhead lines and wiring of the same vintage.
Now: undergrounded, with all new cables, conduits and wiring.
Water
Then: untreated.
Now: micron filtered and UV treated, from the spring-fed stream.
The stream
Then: a culvert that could block.
Now: an open spillway, containment bunds, and 180 tonnes of armour rock.
Tracks & grounds
Then: worn tracks and unretained banks.
Now: upgraded throughout, with new retaining walls where the land asked for them.
Three families have held this bay across eighty years, and each handed it on better than they found it.
Documents for your due diligence
The rebuild's key engineering records, free to view, no sign-up required. The retaining wall holds PS1 and PS4 producer statements and was built under Resource Consent U220950. The wastewater system was consented (RC U230112, BC230173), signed off by the engineer and holds a Code Compliance Certificate, and the drainage serving the Huckstop holds a Code Compliance Certificate under Building Consent BC230235. Further references are available on request through the agents.
A note on names: these documents refer to Lochmara Bay, the larger bay's official name. Rudkin Bay is the family's own name for the small bay the property occupies within it, after the original family who developed the land. Both names describe the same place.
Producer Statement PS1
Design, palisade wall: CPEng, Davidson Group Ltd
View PDF
Producer Statement PS4
Construction review, palisade wall: CPEng, Davidson Group Ltd
View PDF
Code Compliance Certificate
BC230235: Huckstop plumbing and drainage, issued by Marlborough District Council
View PDF
Code Compliance Certificate
BC230173: replacement wastewater system, issued by Marlborough District Council, May 2024
View PDF
As-laid Drainage & Septic Plans
2023: new drainage, wastewater system and disposal field, as laid by Morgan Plumbing
View PDF
Electrical Certificates
2024 certificates of compliance from Pradeep Kumar Electrical
Container shed & jetty power (PDF) Outdoor & jetty lighting (PDF)Engineer's Report
Davidson Group, December 2025: the complete record of remedial works, with consent and Code Compliance references throughout
View PDF
See also the main Buyer's Vault for title, floor plans and further documents.
With Thanks
A rebuild like this is only as good as the people on the tools. The owners are grateful to an exceptional team, many of them born-and-bred Sounds locals, who leaned into the vision and built something that will serve this place into the future. Most of them are still a phone call away, and know every pile, pipe and wire on the property.
Small Spaces, Hamilton
Tessa, Anthony & Johnny: cabin & Huckstop design, build, piling, decks & awnings
Tory Channel Construction
Sam Edwards & Emily: barging, earthworks, demolition, the new bridge, kayak shed
TGS Earthworks
Tom: retaining poles, rock placement & earthworks
Davidson Group Ltd
Leigh McGlynn, CPEng: engineering design, monitoring & certification
Crafar Crouch
Scottie & team: 12-metre tie-backs, concreting to bedrock
Southern Heli Lift
Darren: the Iroquois lift of the cabins, tank & materials
Morgan Plumbing
Adam, Hayden, Sam & the lads: plumbing
Pradeep Kumar Electrical
Pradeep, Shanelle & Ricky: electrical fit-out
Landscaping & gardens
Keith, Pat, Maddie, Kris & Craig: hard landscaping & planting. Special folk.
Martin Hay
Quantity surveyor
Dave & Millie Harper
Counsel, encouragement & ideas throughout
Mike, Denise & Mark
Local legends
“An A+ team we've loved working with, who've become good friends and added to the legacy of this very special Rudkin Bay.”
The owners
Bayleys Marlborough · bayleys.co.nz/offices/marlborough-410